Kecamatan Kec. Lumbung
Data Pencairan:
SD: 2025-02-15
SMP: 2025-02-15
SMA: 2025-01-31
SMK: 2025-01-31
|
|
Sk |
Aktivasi |
% |
SD NEGERI 1 DARMARAJA (20252906) |
|
Siswa |
27 |
27 |
100,00% |
|
Dana |
9.900.000 |
9.900.000 |
100,00% |
|
SD NEGERI 1 LUMBUNG (20212596) |
|
Siswa |
6 |
6 |
100,00% |
|
Dana |
1.575.000 |
1.575.000 |
100,00% |
|
SD NEGERI 1 LUMBUNGSARI (20252311) |
|
Siswa |
17 |
17 |
100,00% |
|
Dana |
5.625.000 |
5.625.000 |
100,00% |
|
SD NEGERI 1 RAWA (20212292) |
|
Siswa |
3 |
3 |
100,00% |
|
Dana |
1.125.000 |
1.125.000 |
100,00% |
|
SD NEGERI 1 SADEWATA (20212295) |
|
Siswa |
10 |
10 |
100,00% |
|
Dana |
2.700.000 |
2.700.000 |
100,00% |
|
SD NEGERI 2 DARMARAJA (20252907) |
|
Siswa |
3 |
3 |
100,00% |
|
Dana |
1.125.000 |
1.125.000 |
100,00% |
|
SD NEGERI 2 RAWA (20211468) |
|
Siswa |
10 |
10 |
100,00% |
|
Dana |
2.475.000 |
2.475.000 |
100,00% |
|
SD NEGERI 2 SADEWATA (20211481) |
|
Siswa |
29 |
29 |
100,00% |
|
Dana |
11.250.000 |
11.250.000 |
100,00% |
|
SD NEGERI 3 LUMBUNG (20211051) |
|
Siswa |
2 |
2 |
100,00% |
|
Dana |
900.000 |
900.000 |
100,00% |
|
SD NEGERI 4 RAWA (20211694) |
|
Siswa |
9 |
9 |
100,00% |
|
Dana |
3.600.000 |
3.600.000 |
100,00% |
|
SDN 1 AWILUAR (20252897) |
|
Siswa |
14 |
14 |
100,00% |
|
Dana |
3.825.000 |
3.825.000 |
100,00% |
|
SDN 1 CIKUPA (20211783) |
|
Siswa |
17 |
17 |
100,00% |
|
Dana |
5.850.000 |
5.850.000 |
100,00% |
|
SDN 1 SUKARAHARJA (20252908) |
|
Siswa |
8 |
8 |
100,00% |
|
Dana |
2.700.000 |
2.700.000 |
100,00% |
|
SDN 2 AWILUAR (20252312) |
|
Siswa |
3 |
3 |
100,00% |
|
Dana |
1.125.000 |
1.125.000 |
100,00% |
|
SDN 2 LUMBUNGSARI (20252896) |
|
Siswa |
11 |
11 |
100,00% |
|
Dana |
3.375.000 |
3.375.000 |
100,00% |
|
SDN 3 LUMBUNGSARI (20211052) |
|
Siswa |
15 |
15 |
100,00% |
|
Dana |
6.300.000 |
6.300.000 |
100,00% |
|
SDN 3 RAWA (20211213) |
|
Siswa |
7 |
7 |
100,00% |
|
Dana |
2.925.000 |
2.925.000 |
100,00% |
|
SDN 3 SADEWATA (20211228) |
|
Siswa |
11 |
11 |
100,00% |
|
Dana |
4.950.000 |
4.950.000 |
100,00% |
|
SLB HARAPAN SAKINAH (20270894) |
|
Siswa |
2 |
2 |
100,00% |
|
Dana |
675.000 |
675.000 |
100,00% |
|
Total |
Siswa |
204 |
204 |
100,00% |
Total |
Rp |
72.000.000 |
72.000.000 |
100,00% |